Rear Reflectors Posted on 27/10/201824/11/2018 by P_A_Long Its been a while since I have updated the blog, so taking advantage of a cold day and the first real... Read More
Air Intake Posted on 02/04/201716/12/2018 by P_A_Long The Air Intake kit arrived today which is relatively straight forward to install and requires the no... Read More
Engine & Gearbox Installation Posted on 22/12/201616/12/2018 by P_A_Long Well we all had a hand in the Engine & Gearbox Installation, team enigma, the northern sailor, s... Read More
Fuel Lines Posted on 22/12/201616/12/2018 by P_A_Long The front section of the Fuel line is now fitted, nothing too special, standard from GD pa... Read More
Steering Alignment Posted on 04/09/201616/12/2018 by P_A_Long Today saw me commence the process of Steering Alignment. Beginning with the fit of the steering rack... Read More
Rear Suspension Posted on 05/09/201516/12/2018 by P_A_Long Equipped with the Gardner Douglas build manual, DVD and the SNG Barratt website permanently nailed u... Read More
Chassis Collection Posted on 05/09/201516/12/2018 by P_A_Long Chassis Collection – After 331 days and an aborted collection due to a powder coat issue on th... Read More
POR15 Posted on 08/01/201521/12/2018 by P_A_Long The recovery of the donor parts commenced today having created my own electrolysis bath to remove th... Read More